- Projektname:
- Mustla Bridge
- Standort:
- Estonia
- Bauzeit:
- 2019
- Designer:
- Geoman Ltd.
- Projektbeschreibung:
- Reinforced Earth retaining structure using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 44,5m
Height (including base block): 4,6 m
The Redi-Rock PC is a reinforced earth retaining wall solution based on the standard Redi-Rock segmental mass-gravity system. A 300mm wide strip of geogrid is pulled through the core of the block and is laid with a layer level with the base of the block and one at the top. Any tension is balanced by that in the other layer, preventing the grid from being pulled through the block. This creates a strong, consistent facing connection that does not vary in capacity with depth. - Software:
-
GEO 5 - Redi-Rock Steinstützmauer
- Dateien:
-
redi-rock-wall-estonia-bridge-abutment.pdf
Redi-Rock Wall - Mustla Bridge Abutment Design, Estonia
Project Gallery Leaflet - Mustla Bridge Estonia
Metro Line C, Prague, Czech Republic
- Projektname:
- Construction of Metro Line C
- Standort:
- Prague - Ladvi - Letnany, Czech republic
- Bauzeit:
- 2002–2007
- Designer:
- METROPROJEKT Praha, a. s.,
Ing. Jaroslav Kopecny - Software:
-
GEO 5 - Verbauwand Vorbemessung
GEO 5 - Verbauwand
Prag - U-Bahn C
Concrete sewer, Slatina, Romania
- Projektname:
- Concrete sewer - Slatina
- Standort:
- Slatina, jud. Olt, Romania
- Bauzeit:
- 2014
- Designer:
- Proexrom, Romania
- Software:
-
GEO 5 - Nagelwand
Project Gallery Leaflet - Concrete Sewer
Nádraží Veleslavín Station, Prague, Czech Republic
- Projektname:
- Nádraží Veleslavín Station, Metro V.A, Prague
- Standort:
- Prague, Czech Republic
- Bauzeit:
- 2011 - 2014
- Designer:
- Metroprojekt Praha a.s.
Ing. Martina Urbánková - Projektbeschreibung:
- Three-aisled station
Length: 100m
Maximum width: 22.34 m
Maximum height: 10.25 m
Side of the excavation area 70.6 m2
Secondary excavation area 42.9 m2 - Software:
-
GEO 5 - FEM
Haltestelle Nádraží Veleslavín
Waterworks Hosterwitz, Dresden, Germany
- Projektname:
- Waterworks Hosterwitz
- Standort:
- Dresden - Hosterwitz, Germany
- Bauzeit:
- 2012
- Designer:
- G.E.O.S. Ingenieurgesellschaft mbH
Dipl. – Ing. Juraj Ortuta, Dipl. – Ing. Andreas Köhler - Projektbeschreibung:
- Safety assessment of complex of buildings for planned increase of flood control waterworks Hosterwitz.
- Software:
-
GEO 5 - FEM
Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road, Saudi Arabia
- Projektname:
- Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road
- Standort:
- Saudi Arabia
- Bauzeit:
- 2017-2018
- Designer:
- Civil Engr. Al-Hussain Hassan
- Projektbeschreibung:
- Tunnel Length:650 M
Depth of excavation: 15.0m
Number of rows of anchors: 5
Distance between anchors: 3.0m
Contractor: Jeddah Foundation Company - Software:
-
GEO 5 - Verbauwand
Bridge “Las Ferias Av”, Venezuela
- Projektname:
- Bridge “Las Ferias Av”
- Standort:
- Valencia City, Venezuela
- Bauzeit:
- 2015
- Designer:
- Sismica C.A. Ing. Edinson Guanchez (Msc, Esp)
- Projektbeschreibung:
- Total Deck Length = 139 m (4 spans)
Maximum span length = 36 m
Access Ramps Length = 250 m
Total Bridge Length = 389 m - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Bewehrte Erde
GEO 5 - Widerlager
GEO 5 - Pfahl
GEO 5 - Pfahlgruppe
- Dateien:
-
additional-description-and-drawings.pdf
Deep Excavation in Prishtina, Kosovo
- Projektname:
- Deep Excavation - Anchored Diaphragm Wall
- Standort:
- Prishtina, Kosovo
- Bauzeit:
- 2018
- Designer:
- "Geotest Engineering", Prishtinë
Dr. Ing. Qani V. Kadiri
Ing. Adrian Kadiri - Projektbeschreibung:
- Depth of excavation: 19.5m
Thickness of diaphragm wall: 0.6m
Number of rows of anchors: 5
Distance between anchors: 2.5m
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Verbauwand
- Dateien:
-
deep-excavation-in-prishtina.pdf
12-meter high Gabion Wall, Mexico
- Projektname:
- 12-meter high Gabion Wall
- Standort:
- Guanajuato, Gto. México
- Bauzeit:
- 2015
- Designer:
- Ing. Pedro J. Villarreal Pinzón
TREE CONTACTO S.A. DE C.V. - Software:
-
GEO 5 - Gabione
- Dateien:
-
PDF - GEO5 - Gabion report
Athienou Sewage Treatment Plant and associated works, Cyprus
- Projektname:
- Athienou Sewage Treatment Plant and associated works
- Standort:
- Cyprus
- Bauzeit:
- 2015 - 2017
- Designer:
- Ioannis Pericleous, MSc, CEng, MIStructE
- Projektbeschreibung:
- The project was a Design, Build, Operate contract and it included a sewage treatment plant with RC water tanks, one water retaining earth lagoon with capacity 100.000m3 and one 3.000m3. Project also included the design of several other associated works, such roads, 4no. Pumping stations located in Athienou community approx. 8m deep each, building irrigation network, etc.
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Setzung
-
Line 4 Metro, Budapest, Hungary
- Projektname:
- Budapest Metro Line 4
- Standort:
- Keleti Railway Station - Budapest, Hungary
- Bauzeit:
- 2007
- Designer:
- Goda Balázs, Honti Imre, Huszka Gábor Főmterv Zrt.
- Software:
-
GEO 5 - Verbauwand
Office buildings, Madrid, Spain
- Projektname:
- Construction office buildings “Quinta de los Molinos”
- Standort:
- Madrid, España
- Bauzeit:
- 2004-2005
- Designer:
- Daniel Danés Grases
- Software:
-
GEO 5 - FEM
GEO 5 - Nagelwand
Drilled piles, Brasilia, Brazil
- Projektname:
- Drilled piles
- Standort:
- Brasilia, Brazil
- Bauzeit:
- 2003–2005
- Designer:
- Renato P. Cunha, MSc, PhD
- Software:
-
GEO 5 - Verbauwand Vorbemessung
GEO 5 - Verbauwand
Gabion revetments, Ostrowo, Poland
- Projektname:
- Gabion revetments – Jastrzębia Góra – Ostrowo
- Standort:
- Jastrzębia Góra – Ostrowo, Poland
- Bauzeit:
- 2012
- Designer:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - Gabione
- Dateien:
-
geo5-report-ostrowo.pdf
High-rise building, Istanbul, Turkey
- Projektname:
- High-rise building
- Standort:
- Istanbul, Turkey
- Bauzeit:
- 2007
- Designer:
- NYS Project Consultancy and Constracting Co.
Ing. Yavuz Seymen - Software:
-
GEO 5 - Verbauwand Vorbemessung
GEO 5 - Verbauwand
High-rise building Soyak, Istanbul, Turkey
- Projektname:
- High-rise building Soyak
- Standort:
- Istanbul, Turkey
- Bauzeit:
- 2011-2012
- Designer:
- NYS Constructıon
- Projektbeschreibung:
- Excavation depth: 32,5m
Piles installed: 10,700m
Anchors installed: 71,000m
Soil excavation: 205.000 m3 - Software:
-
GEO 5 - Verbauwand
Kanianka dam, Slovakia
- Projektname:
- Kanianka dam
- Standort:
- Town of Kanianka, Slovakia
- Bauzeit:
- 2004
- Designer:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - FEM
New Connection, Prague, Czech Republic
- Projektname:
- New Connection Prague
- Standort:
- Prague Main Station - Masaryk’s Station – Liben - Vysocany, Czech republic
- Bauzeit:
- 2004–2010
- Designer:
- Ing.Miroslav Sedivy
- Software:
-
GEO 5 - FEM
Pedestrian tunnel, Gdansk, Poland
- Projektname:
- Pedestrian tunnel – Gdansk
- Standort:
- Gdańsk, Poland
- Bauzeit:
- 2013
- Designer:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - FEM – Tunnel
Q22 Excavation Pit, Warsaw, Poland
- Projektname:
- Q22 Excavation Pit, Warsaw, Poland
- Standort:
- Warsaw, Poland
- Bauzeit:
- 2013 - 2016
- Designer:
- Buro Happold Polska Sp. z o.o.
Maciej Sobotkowski, MSc. Eng.
Zbigniew Czajewski, MSc. Eng. - Projektbeschreibung:
- 155 meters high office building with 5 underground levels. The depth of the excavation pit is more than 20 meters.
- Software:
-
GEO 5 - Verbauwand
Retaining walls RediRock, Newport, USA
- Projektname:
- Sanville memorial public works facility
- Standort:
- Newport, USA
- Bauzeit:
- 2008
- Designer:
- Souhegan Valley Engineering Inc.
New Hampshire, Newport USA - Software:
-
-
Shopping Center and Housing Project, Antalya, Turkey
- Projektname:
- Shopping Center
- Standort:
- Antalya, Turkey
- Bauzeit:
- 2009-2010
- Designer:
- NYS Constructıon
- Projektbeschreibung:
- Excavation depth: 24m
Bored Piles installed: 18,000m
Anchors installed: 108,000m - Software:
-
GEO 5 - Verbauwand
Temporary containment of terrain, Tenerife Norte, Spain
- Projektname:
- Temporary containment of terrain
- Standort:
- Valle Colino, Tenerife Norte, Spain
- Bauzeit:
- 2006
- Designer:
- Francisco Javier Cruz García
- Software:
-
GEO 5 - Nagelwand
Tesare dam, Tesare, Slovakia
- Projektname:
- Tesare dam
- Standort:
- Town of Tesare, Slovakia
- Bauzeit:
- 2004
- Designer:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - FEM
Tunnel ventilation access, Lérida, Spain
- Projektname:
- Tunnel ventilation in AVE and Lérida access
- Standort:
- Avenue Once de Septiembre, Lérida, España
- Bauzeit:
- 2008
- Designer:
- Ignacio Zuloaga
- Software:
-
GEO 5 - FEM
VMO Dobrovského, Prague, Czech Republic
- Projektname:
- VMO Dobrovského Brno
- Standort:
- Road I/42 Brno, Czech republic
- Bauzeit:
- 2002–2005
- Designer:
- Ing. Jaroslav Lacina
- Software:
-
GEO 5 - FEM
Newry, Ireland - Dominican Chapel, Ireland
- Projektname:
- Newry, Ireland - Dominican Chapel
- Standort:
- Newry, Northern Ireland
- Bauzeit:
- 2017
- Designer:
- Geoman Ltd.
Liam K.D. - Projektbeschreibung:
- Landscaping by MacWall system with NFC Fill.
Wall height: from 1.8 m to 3.6 m
Total number of walls: 5
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Bewehrte Erde
- Dateien:
-
PDF - Additional information about the project (detailed description, photos, documentation)
El Cerrillo Park Comenar Viejo, Spain
- Projektname:
- El Cerrillo Park Comenar Viejo
- Standort:
- Madrid, Spain
- Bauzeit:
- 2019
- Designer:
- Wall Designer: Geoman Ltd.
Redi-Rock Supplier: Memorial Parks - Projektbeschreibung:
- Reinforced retaining wall using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 70,2m
Max. height: 5,02 m
GEO5 Prefab Wall was used to assess the suitability of sheets of Geotextile reinforcement with a friction connection between blocks when the walls surpassed achievable heights using mass gravity, the Redi-Rock Wall module was used for standard Gravity analysis while the Stability Module provided global analysis for all sections considered.
The wall was founded on competent medium-dense granite sand and designed using the Spanish adaption of EC7 (UNE-EN 1997-1:2004) and associated annex.
The local soil group is described as Leptosols. The soil unit was described as Lithic and Dystric. - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Block Stützmauer
Brantham, Suffolk - Two reinforced walls, UK
- Projektname:
- Brantham, Suffolk - Two reinforced walls
- Standort:
- Brantham, Suffolk, UK
- Bauzeit:
- 2021
- Designer:
- Kenneth Knox, Stabilisure Ltd.
- Projektbeschreibung:
- Two 5.3m high, 70m long Rootlok hybrid nailed MSE walls at Stour view.
Number of rows of soil nails: 7
Nails distance: approx. 80cm
Total length of the supporting structure: 70m - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Bewehrte Erde
- Dateien:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Allenton, Derby - Ecocrib retaining wall, UK
- Projektname:
- Allenton, Derby - Ecocrib retaining wall
- Standort:
- Allenton, Derby, UK
- Bauzeit:
- 2020
- Designer:
- William Morrow (Geoman Ltd.)
Installer/ material supplier: PC Construction - Projektbeschreibung:
- Ecocrib retaining wall - 100% recycled mixed polymer retaining crib wall system.
Maximum retained height: 4.1m
Total length: 50m - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Block Stützmauer
- Dateien:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Lawley Village Phase 10, Telford, UK
- Projektname:
- Lawley Village Phase 10, Telford
- Standort:
- Lawley Village, Telford
- Bauzeit:
- 2021
- Designer:
- Kenneth Knox
Geoman Ltd. - Projektbeschreibung:
- Height of reinforced slope: up to 6m
Total length of the slope: 300m
Slope stabilization technology: soil bag facing - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Bewehrte Erde
- Dateien:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Building of World Trade Center Asuncion
- Projektname:
- Building of World Trade Center Asuncion
- Standort:
- Asunción - Paraguay
- Bauzeit:
- 2012
- Designer:
- Ing. Augusto J. Leoni
- Projektbeschreibung:
- Pile curtain with not pre-tensioned (passive) anchors.
Depth of excavation: 16 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: 2.50 m - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Verbauwand
Expansion of shopping center Shopping del Sol
- Projektname:
- Expansion of shopping center Shopping del Sol
- Standort:
- Asunción - Paraguay
- Bauzeit:
- 2014
- Designer:
- Ing. Augusto J. Leoni
- Projektbeschreibung:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 to 18 m
Diameter of piles: 0,23 m
Piles spacing: 0,90 m
Number of rows of anchors: 4
Distance between anchors: Variable - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Verbauwand
Apartment house Eminent
- Projektname:
- Apartment house Eminent - Asunción
- Standort:
- Asunción - Paraguay
- Bauzeit:
- 2015
- Designer:
- Ing. Augusto J. Leoni
- Projektbeschreibung:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: Variable - Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Verbauwand
Paseo del Bajo parking in front of the Casa Rosada
- Projektname:
- Paseo del Bajo parking in front of the Casa Rosada
- Standort:
- Argentina - Buenos Aires
- Bauzeit:
- 2019
- Projektbeschreibung:
- The construction pit is in close proximity to the historic sewerage system, which is more than 100 years old. The front of the excavation at a distance of only 6m from the sewer.
Depth of excavation: 10,5 m
Number of rows of anchors: 4
Distance between anchors: 2.50 m - Software:
-
GEO 5 - FEM
GEO 5 - Verbauwand
Design of a Rock Slope
- Projektname:
- Design of a Rock Slope
- Standort:
- Guizhou Province, China
- Bauzeit:
- 2016 - 2017
- Designer:
- Guizhou Metallurgical Design and Research Institute
- Projektbeschreibung:
- Rock slope stabilization using anchored reinforced concrete beams with two rows anti-slide piles at the lower edge of the slope.
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - FEM
GEO 5 - Stabilisierungspfahl
- Dateien:
-
Output protocol from the GEO5 Slope Stability program
Slope stabilization using three rows of Anti-slide piles
- Projektname:
- Slope stabilization using three rows of Anti-slide piles
- Standort:
- Jiangsu Province, China
- Bauzeit:
- 2016
- Designer:
- Geological Engineering Investigation of Jiangsu Province
- Projektbeschreibung:
- Slope stabilization with three rows of Anti-slide piles. Three separate series of stabilization piles: Pile diameter: 1m, 1m, 1.5m Pile depth: 9m, 11m, 15m Stabilization pile wall width: 19m, 27m, 33m Length of the stabilized part of the slope: approx. 120m
- Software:
-
GEO 5 - Böschungsbruch
GEO 5 - Stabilisierungspfahl
- Dateien:
-
Output protocol from the GEO5 Slope Stability program
Shanghe Hanghu East Station - Retaining Wall
- Projektname:
- Shanghe Hanghu East Station - Retaining Wall
- Standort:
- Zhejiang Province, China
- Bauzeit:
- 2014 - 2016
- Designer:
- China Railway Siyuan Survey and Design Group Co., Ltd.
- Projektbeschreibung:
- Slope supporting structures at the railway corridor. Retaining reinforced concrete wall based on piles and reinforced MSE wall. Depth of foundation piles: 18.5 m Height of the reinforced retaining wall: 4.6 m Height of MSE wall: 4.6 m Number of rows of geo-reinforcements: 4 Reinforcement length: 4m
- Software:
-
GEO 5 - Bewehrte Erde
GEO 5 - Winkelstützmauer
GEO 5 - Pfahl
- Dateien:
-
Output protocol from the GEO5 Cantilever wall and MSE wall program
Niuzhaishan Tunnel
- Projektname:
- Niuzhaishan Tunnel
- Standort:
- Fujian Province, China
- Bauzeit:
- 2012 - 2014
- Designer:
- Geological Engineering Investigation of Fujian Province
- Projektbeschreibung:
- The Niuzhaishan Tunnel in total length 1,697 m.
The double arc-tube highway tunnel will span four lanes in each direction.
Excavation tube width: 32 m.
Excavation tube height: 22,5 m. - Software:
-
GEO 5 - FEM
GEO 5 - FEM – Tunnel
GEO 5 - Stratigraphie
- Dateien:
-
China Niuzhaishan Tunnel Output Report
Construction of Expressway S7, Poland
- Projektname:
- Construction of Expressway S7, Koszwały-Nowy Dwór Gdański
- Standort:
- Poland
- Bauzeit:
- 2018
- Designer:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Projektbeschreibung:
- Stabilization of the expressway subsoil using a group of piles.
Pile diameter: 0,40m
Number of drilled displament piles: 186000
- Software:
-
GEO 5 - FEM
- Dateien:
-
poland-subsoil-stabilization-expressway.pdf