GEO5 Software

Online Hilfe

Tree
Settings
Programm:
Sprache:

Activation

The program allows for removing (deactivating) soils from individual regions. As an example, we consider an embankment analysis. In such a case, it must be accounted for already in the topology regime when creating the overall geometrical model. In the 1st calculation stage, however, it can be deactivated. A similar approach applies also to underground or open excavations (tunnels, sheeting structures). When deactivating a region below the groundwater it is necessary to correctly model the region boundary.

Modeling embankment - 1st construction stage

The embankment can be subsequently reactivated in the next construction stage.

Modeling embankment - the activity of embankment body

Using GeoClipboard there's a possibility to copy the current profile as sorted interfaces and allow copying profile to another program. Copied interfaces are corrected to follow specifications to 2D profile entered from top to bottom.

Testen Sie die GEO5 Software selbst.
Laden Sie die kostenlose Demoversion herunter.